Commissioning of the capital construction facility. Act of Acceptance of a Capital Construction Facility

One of the most responsible and important stages of reconstruction and repair of a capital construction object is its commissioning. To do this, you must contact the appropriate authority and submit the documents. Next, we will see how commissioning of the facility capital construction. commissioning of the capital construction facility

General information

What is capital construction facility? The definition, characteristics and types of structures of this type are given in legislation. In particular, it is explained that this category includes buildings whose construction is not completed. Types of capital construction projects do not include temporary structures, awnings, kiosks and similar structures.

Classification

The legislation provides a list of capital construction projects. This category includes:

  • Building. It is a three-dimensional structure, in which there are aboveground and (or) underground parts. It includes premises, engineering and technical support systems. Such buildings are intended for activities, people living, storage of products, production location or keeping animals. Buildings can be residential or non-residential.
  • Construction. It is a linear, planar or volumetric design. It may contain aboveground, ground and (or) underground parts. The construction consists of supporting, and in some cases, fencing elements. This design is intended for the movement of goods or people, temporary residence, storage of products, production activities. operation of capital construction

Obtaining permission: general information

After carrying out repair work or reconstruction, it is necessary to obtain a document on the basis of which it is allowed to use the capital construction object. Determination of the readiness of a building or structure is carried out by the body that issued the permit for the construction. This procedure is carried out within 10 days from the date of application. Along with this, the regulatory body checks the availability and correctness of the necessary documentation. If state supervision is performed during the reconstruction or repair process, then no additional inspection of the structure or building is carried out. Based on the results of the events, the authorized authority issues a permit for commissioning the capital construction facility.

Resolution

Based on this document, commissioning of the capital construction facility is carried out. The permit certifies the completion of the construction, repair or reconstruction of the building in full according to the available documentation. This paper indicates the conformity of the erected, repaired or reconstructed construction of the design documentation and the urban development plan of the site. Based on the information contained in the permits, cadastral registration of capital construction objects is carried out. In this regard, the information in the document is indicated to the extent necessary for the registration of the structure. In particular, in commissioning authorization capital construction object reflects the data corresponding to the text and graphic parts of the technical plan. capital construction definition

Graphic Information

This information reproduces the data of the cadastral plan of the territory or an extract about the land plot and the location of the structure.In this document, the room is presented in the form of a drawing of the floor or part thereof, indicating the exact location. If the structure or building does not have a number of storeys, then a plan of the corresponding fragment is given. It also indicates the location of the premises. The location is determined by graphically depicting the border of the geometric figure that will be formed by the inner sides of the external walls on the floor plan (its fragment) or the entire structure / building in the absence of a number of storeys.

Text Details

They include:

  • Information about the type of property (premises, construction, land, etc.).
  • Description of the location of the premises within the boundaries of the floor or structure / building (if it acts as real estate).
  • Cadastral number of the structure / building and the date of its entry in the state register.
  • Description of the location of the structure on the site.
  • Cadastral number of the facility where the premises are located, floor number (if any).
  • Area of ​​the structure / building. types of capital construction

additional information

As they can be considered:

  • The address of the object (if there is no description of the location).
  • Cadastral number of the parcel within the boundaries of which a building or building is located.
  • Data on proprietary rights and their owner. Such information is reflected to the extent that it is provided in the Unified Register established by law.
  • Data on the cadastral value, date of approval.
  • The purpose of the room / structure / building.
  • Type of living space (apartment or room), if it acts as a property located in an apartment building.
  • The number of floors, including underground.
  • The material from which the external walls are made, if the structure / building acts as an object.
  • Email / postal address where you can contact the owner.
  • The year in which the commissioning of the facility / building was completed at the end of construction or the year the construction was completed. acceptance of capital construction

Permission Denied

The body making a negative decision on putting the facility into operation should provide a reasoned explanation and indicate the reasons. The latter may be:

  • Lack of necessary documentation to obtain permission.
  • Inconsistency of the parameters of the repaired or reconstructed structure / building. This provision does not apply to the design of individual housing.
  • Non-compliance of the facility with the requirements of the urban development plan of the site or with the requirements contained in the building permit.
  • Failure by the responsible person to transfer to the authorized body information on the area, number of floors and height of the planned structure / building, as well as engineering and technical support networks. The lack of copies of the results of surveys, sections of design documents or the planning scheme of the land plot indicating the location of the structure for placement in the information base for urban planning.  accounting of capital construction

A permit is issued only after the provision of the indicated securities.

Act of Acceptance of a Capital Construction Facility

This document is drawn up on a standard form. At the top right is the Approved box. In this place the signature of the head of the architectural bureau. The acceptance certificate of the capital construction object in the text part contains the date of the audit, a list of members of the commission. It also contains the full name of the structure / building, which was subject to examination. The lower part of the document contains special columns. They are signed by all members of the commission who carried out the acceptance of the capital construction facility. If any of the participants does not agree with the conclusions within their responsibility and refuses to attest the document with his signature, he must argue this decision.The reasons are stated in writing on behalf of the supervisory authority from which it is authorized to conduct control activities.

Decision

In case of discrepancies, the commission sets the period during which they will be eliminated. At the end of this period, an inspection is again conducted. If the act on commissioning the facility is not signed by any of the inspectors, they draw up a motivated opinion indicating the reasons and confirming the facts of non-compliance. Frequent causes of failures, as practice shows, are insufficient safety of capital construction facilities.

If the customer does not agree with the decision, he has the right to appeal it in court. The Commission may inspect the structure / building until all non-conformities are resolved. If a positive decision is made, the documents are transferred to an authorized agency for permission. After that, official operation of capital construction facilities can be carried out.


1 comment
Show:
New
New
Popular
Discussed
×
×
Are you sure you want to delete the comment?
Delete
×
Reason for complaint
Avatar
gasim
Do I have to pay for the commissioning of the exploitation of health

store shop.
Reply
0

Business

Success stories

Equipment